Abstract
New models of heat pumps and new production programmes by OCHSNER Wärmepumpen GmbH impact the material requirement, storage and internal material supply. Production and logistics data are kept in different sources, and cannot be analysed together using one unified analysis. Thus, possible shortages of storage locations or forklift capacity may only occur after a production programme is determined. This thesis aims at developing an Excel-based decision support model which will translate changes in production quantities and structure into capacity requirement and allow detecting logistics bottlenecks in advance.Having performed an analysis of the existing operational situation and requirements of the model, two Excel workbooks were created for warehouse and forklift capacity planning. The model consists of monthly production quantities, bill of materials, article master data, warehousing data and logistics parameters. Power Query is used to perform data transformation and aggregation, while Excel functions process the planning parameters set by user. The module for calculating warehouse capacity calculates the necessary number of load carriers and storage locations for each type of storage location, and delivers monthly and annual utilisation results. The module for calculating forklift capacity calculates the necessary time for transport and compares it with the available monthly capacity. There is an additional manual tool for evaluating machine combination and staffing. The model was illustrated on a freely made-up production programme with 7 products and 3,655 product parts, since the low utilisation in the plant won't show all possible capacity cases.
The findings reveal that the mean utilisation rates could hide transient peaks. The warehouse utilisation rate calculated based on the monthly utilisation rates is 36.6%, whereas the calculation carried out separately for the year totals up to 35.4%. However, storage location F attains 95.6% in October and storage location B attains 83.8%. Even though the maximum capacity of the warehouse is not exceeded numerically, there is very little margin left for storage location F. Forklifts’ utilisation reaches 100.1% in October: the required amount of time (13,696.64 minutes) is compared against 13,680 minutes available; thus, there is a lack of about 16.64 minutes. The comparison carried out manually for one selected combination of machines yields a positive yet very limited time margin of 2.45 minutes. Thus, the model illustrates the significance of evaluating the capacities of both warehouse and forklifts together and on a monthly basis. It represents a tool for transparent planning which reduces manual effort of consolidating the data and allows identifying bottlenecks timely. Its correctness depends on the completeness of master data and realistic assumptions.
| Date of Award | 2026 |
|---|---|
| Original language | German (Austria) |
| Awarding Institution |
|
| Supervisor | Hans-Christian Graf (Supervisor) |
Studyprogram
- International Logistics Management
Cite this
- Standard