Abstract
Problem Statement: Retail food distribution is characterized by high requirements regarding product availability, freshness, and delivery speed. In order to ensure the timely supply of stores, numerous logistics processes must be coordinated within defined time windows. A key element in this context is the use of cut-off times, which determine until when orders can be considered for a specific delivery cycle. Changes to these cut-off times directly affect downstream processes such as order picking, route planning, loading, and transportation. At the same time, trade-offs arise between a high degree of flexibility, efficient resource utilization, and stable process execution. Against this background, the present thesis examines the impact of modified cut-off times on outbound logistics processes and delivery performance within retail food distribution.Objective and Methodology: The objective of this bachelor’s thesis is to analyze the effects of modified cut-off times on the logistics processes of an Austrian food retail company. First, the theoretical foundations of retail and food logistics as well as the role of cutoff times within logistics process chains are presented. Subsequently, the existing process structure and relevant system landscape are analyzed. Based on these findings, three practical optimization scenarios are developed and evaluated with regard to their impact on logistics processes and performance indicators. The thesis is based on a combination of literature research, company data, process analyses, and the assessment of logistics interrelationships using selected case studies.
Key Findings: The results show that changes in cut-off times have significant effects on the entire outbound logistics process chain. By integrating PM goods into existing AM tours, transport capacities can be utilized more efficiently and vehicle utilization can be increased. Furthermore, the analyses demonstrate that both modified delivery areas and a differentiated design of cut-off times for stores located close to the distribution center can influence process stability, planning reliability, and delivery punctuality. The study highlights that optimization measures can create efficiency gains, but at the same time may reduce existing time buffers and increase dependencies between individual process steps. Consequently, the successful design of cut-off times requires a holistic view of logistics processes as well as a balanced consideration of flexibility, efficiency, and service level.
| Date of Award | 2026 |
|---|---|
| Original language | German (Austria) |
| Awarding Institution |
|
| Supervisor | Efrem Lengauer (Supervisor) |
Studyprogram
- International Logistics Management
Cite this
- Standard