Projects per year
Abstract
The performance of modern production systems often depends upon automated production planning strategies such as material requirements planning. Parametrizing, evaluating and comparing these strategies by testing them in the real world is often difficult and prohibitively resource intensive. State-of-the-art computer simulation can be used to adequately model the production processes and predict the relevant performance metrics without investing valuable production capacities. Heuristic optimization procedures can build on these simulations to fine-tune production planning strategies. A major obstacle for this simulation-based optimization approach, however, lies in its computational requirements since accurate production simulations require their fair share of computation time. In this work, we will demonstrate the use of heuristic optimization to learn optimal production strategies for a bi-objective high-dimensional real world scenario and explore how to reduce the computational cost of the heuristic search by use of surrogates and dimensionality reduction. Results indicate that the employed approach achieved solutions that could outperform the production planning parameters currently used in the real world.
Original language | English |
---|---|
Pages (from-to) | 1117-1126 |
Number of pages | 10 |
Journal | Procedia Computer Science |
Volume | 217 |
DOIs | |
Publication status | Published - 13 Jan 2023 |
Keywords
- Simulation
- Surrogate modeling
- Surrogate-assisted optimization
- Production system
- Lot size
- Planned lead time
Fingerprint
Dive into the research topics of 'Simulation-based Optimization of Material Requirements Planning Parameters'. Together they form a unique fingerprint.Projects
- 2 Finished
-
JRZ adaptOp - Josef Ressel Center for Adaptive Optimization in Dynamic Environments
Wagner, S. (PI), Leitner, S. J. (CoI), Beneder, M. (CoI), Heckmann, M. K. (CoI), Werth, B. (CoI), Fleck, P. (CoI), Hauder, V. (CoI), Beham, A. (CoI), Neuhauser, P. (CoI) & Karder, J. A. (CoI)
01.10.2019 → 30.09.2024
Project: Research Project
-
SimGenOpt2 - Integrated Methods for Robust Production Planning and Control
Beham, A. (PI), Altendorfer, K. (CoPI), Wagner, S. (CoI), Affenzeller, M. (CoI), Jodlbauer, H. (CoI), Brunner, M. (CoI), Werth, B. (CoI), Muhr, D. (CoI), Seiringer, W. (CoI) & Karder, J. A. (CoI)
01.03.2017 → 01.03.2021
Project: Research Project