TY - JOUR
T1 - Simulation and testing of the over-current protection system based on IEC 61850 Process-Buses and dynamic estimator
AU - Abdolkhalig, Ahmed
AU - Zivanovic, Rastko
PY - 2015/6/1
Y1 - 2015/6/1
N2 - This paper presents a successful real-time simulation and testing of the over-current protection system based on IEC 61850-9-2 Sampled Measured Values communication and a dynamic estimator using a simulator of the real-time environment. The TrueTime software and the Matlab Simulink had been integrated into the real-time environment simulator for testing real-time performance of the IEC 61850 Process-Bus and the protection system. Performance of the IEC 61850 Process-Bus communications can be affected by many factors like, bandwidth and cable length. These factors will affect the measurements provided to protective relays through Process-Bus due to delay or loss of some Sampled Measured Values. The purpose of the tests in the real-time environment simulator is to show how an over-current protection relay would react to operation conditions of the IEC 61850 Process-Bus. Understanding how a physical protection system can respond to IEC 61850 Process-Bus communication will give engineers the confidence that is needed to assure that the system under consideration will behave as acceptable.
AB - This paper presents a successful real-time simulation and testing of the over-current protection system based on IEC 61850-9-2 Sampled Measured Values communication and a dynamic estimator using a simulator of the real-time environment. The TrueTime software and the Matlab Simulink had been integrated into the real-time environment simulator for testing real-time performance of the IEC 61850 Process-Bus and the protection system. Performance of the IEC 61850 Process-Bus communications can be affected by many factors like, bandwidth and cable length. These factors will affect the measurements provided to protective relays through Process-Bus due to delay or loss of some Sampled Measured Values. The purpose of the tests in the real-time environment simulator is to show how an over-current protection relay would react to operation conditions of the IEC 61850 Process-Bus. Understanding how a physical protection system can respond to IEC 61850 Process-Bus communication will give engineers the confidence that is needed to assure that the system under consideration will behave as acceptable.
KW - Digital over-current relay
KW - IEC 61850 Process-Bus
KW - Kalman filter
KW - Sampled Measured Values
UR - http://www.scopus.com/inward/record.url?scp=84937832250&partnerID=8YFLogxK
U2 - 10.1016/j.segan.2015.04.001
DO - 10.1016/j.segan.2015.04.001
M3 - Article
AN - SCOPUS:84937832250
SN - 2352-4677
VL - 2
SP - 41
EP - 50
JO - Sustainable Energy, Grids and Networks
JF - Sustainable Energy, Grids and Networks
ER -