Range, work in progress and utilization

Research output: Contribution to journalArticlepeer-review

6 Citations (Scopus)

Abstract

For the design of a supply chain as well as for a production system, the relationship between utilization, range, lead time and work in progress is very important. Because of the cost of the available capacity, the utilization should be high, but on the other hand full utilization has a negative impact on the lead time and work in progress. In this paper, some relationships for a continuous production system are formulated and theoretically proven between average lead time, average range, average work in progress and average utilization for a multi-item system with a dynamic demand. The basic equation that is developed is the continuous and deterministic analogous relationship to the well-known Little Law based on queuing theory. The theoretically deduced and proven logistical curves are similar to the results of the funnel model based on empirical studies and simulation. One interesting result is that the variability of the inventory or of the production load causes a waste of capacity and therefore a reduced utilization and an increased lead time. With the help of the deduced relationships, rules for the design and control of a production system are introduced.

Original languageEnglish
Pages (from-to)4771-4786
Number of pages16
JournalInternational Journal of Production Research
Volume43
Issue number22
DOIs
Publication statusPublished - 15 Nov 2005

Keywords

  • Inventory
  • Lead time
  • Range
  • Utilization
  • Work in progress

Fingerprint

Dive into the research topics of 'Range, work in progress and utilization'. Together they form a unique fingerprint.

Cite this