Abstract
We evaluate the in-control performance of the S2 control chart with estimated parameters conditional on the Phase I sample. Simulation results indicate no realistic amount of Phase I data is enough to have confidence that the in-control average run length (ARL) obtained will be near the desired value. To overcome this problem, we adjust the S2 charts control limits such that the in-control ARL is guaranteed to be above a specified value with a certain specified probability. The required adjustment does not have too much of an adverse effect on the out-of-control performance of the chart.
Original language | English |
---|---|
Pages (from-to) | 4405-4413 |
Number of pages | 9 |
Journal | International Journal of Production Research |
Volume | 53 |
Issue number | 14 |
DOIs | |
Publication status | Published - 18 Jul 2015 |
Keywords
- average of ARL (AARL)
- average run length (ARL)
- bootstrap
- effect of estimation error
- standard deviation of ARL (SDARL)