Keyphrases
Adjusted Average Time to Signal
20%
Assignable Cause
20%
Burr
20%
Burr Distribution
20%
Burr XII
100%
Burr XII Distribution
40%
Constrained Optimal Design
100%
Continuous Process
20%
Control Chart
20%
Control Design
20%
Correlated Data
20%
Correlated Observations
20%
Cost Model
80%
Cost Parameters
40%
Cost per Unit
20%
Design Methodology
20%
Design Parameters
40%
Distribution Parameter
20%
Economic Statistics
20%
Failure Mechanism
100%
Loss Cost
20%
Loss Design
20%
Mean Shift
20%
Model Distribution
20%
Multiple Assignable Causes
100%
Non-uniform Sampling
20%
Number of False Alarms
20%
Numerical Examples
20%
Observation Process
20%
Prior Distribution
20%
Realistic Approach
20%
Sampling Optimization
20%
Sensitivity Analysis
20%
Shift Parameter
20%
Shock Model
80%
Time Parameter
20%
Variable Sampling Interval
20%
X Chart
40%
X Control Chart
100%
Mathematics
Burr Distribution
25%
Continuous Process
25%
Correlated Observation
25%
Design Parameter
50%
Distribution Parameter
25%
False Alarm
25%
mean shift
25%
Nonuniform
25%
Numerical Example
25%
Observation Process
25%
Optimal Design
100%
Real Life
25%
Sampling Interval
25%
Sampling Scheme
25%
Shock Model
100%
Time Average
25%
Time Parameter
25%
Unit Time
25%
Engineering
Burrs
100%
Continuous Process
14%
Control Charts
100%
Design Parameter
28%
Distribution Model
14%
Distribution Parameter
14%
Failure Mechanism
100%
False Alarm
14%
Limitations
14%
Numerical Example
14%
Observation Process
14%
Optimal Design
100%
Optimal Scheme
14%
Practical Aspect
14%
Real Life
14%
Sampling Interval
14%