Projects per year
Network
Recent external collaboration on country/territory level. Dive into details by clicking on the dots or
Projects
- 1 Finished
-
SimGenOpt2 - Integrated Methods for Robust Production Planning and Control
Beham, A., Karder, J. A., Brunner, M., Altendorfer, K., Werth, B., Seiringer, W., Wagner, S., Affenzeller, M., Jodlbauer, H. & Lausberger, V. A.
01.03.2017 → 01.03.2021
Project: Research Project
Research output
- 1 Conference contribution
-
Simulation-based demand forecast generation to analyze forecast accuracy and its influence on logistical performance
Altendorfer, K., Seiringer, W. & Felberbauer, T., 18 Sep 2021, Proceedings ASIM Fachtagung Simulation in Produktion und Logistik 2021: Simulation in Produktion und Logistik. Franke, J. & Schluderer, P. (eds.). Göttingen: Cuvillier Verlag, p. 399-408 10 p.Research output: Chapter in Book/Report/Conference proceedings › Conference contribution › peer-review