Projects per year
Search results
-
Active
BioH2Region - BA0100157 - BioH2Region - "Kompetenzregion für erneuerbaren Wasserstoff und Grüne Gase"
Steinmaurer, G. (PI), Zettl, B. (CoPI), Daborer-Prado, N. (CoI), Issayan, G. (CoI) & Schnellendorfer, M. (CoI)
Interreg Bavaria – Austria 2021 to 2027
01.07.2024 → 30.06.2027
Project: Research Project
-
Indek-Met - Entwicklung einer mathematischen Methode zur kostengünstigen Analyse von Dekarbonisierungs-potentialen in der Industrie
Steinmaurer, G. (PI), Dehner, H. (CoI), Schnellendorfer, M. (CoI) & Mühleder, H. (CoI)
Future Energy Technologies - Land OÖ
01.06.2024 → 31.05.2026
Project: Research Project
-
OpenGrid4PV - Smarte Lösungsansätze zur Steigerung der PV-Einspeisekapazität in Verteilnetzen
Steinmaurer, G. (PI), Schnellendorfer, M. (CoI), Gaisberger, L. (CoI) & Kefer, P. (CoI)
Future Energy Technologies - Land OÖ
01.03.2024 → 31.08.2026
Project: Research Project
-
BF CoE-E/SP - Basic funding for the CoE-E and CoE-SP
Brunner, M. (PI) & Carreras Oliver, F. (CoI)
01.01.2024 → 31.12.2026
Project: Research Project
-
ICE4H&C - ICE-Heating and Cooling for SFH and MFH
Steinmaurer, G. (PI), Dehner, H. (CoI), Schnellendorfer, M. (CoI), Issayan, G. (CoI), Wagner, C. (CoI), Resch, A. (CoI) & Daborer-Prado, N. (CoI)
Future Energy Technologies - Land OÖ
01.01.2024 → 31.12.2025
Project: Research Project
-
RESTORE - Effects from different energy storage technologies on sector-coupled energy systems
Steinmaurer, G. (PI), Schnellendorfer, M. (CoI) & Wagner, C. (CoPI)
Dissertationsprogramm der Fachhochschule OÖ
01.10.2023 → 30.09.2026
Project: Research Project
-
HyBRID – Teil1 (Soft) - H2-Researchcenter
Plank, B. (CoI), Zettl, B. (CoI), Daborer-Prado, N. (CoI), Weidinger, F. (CoI), Gaisberger, L. (CoI), Schnellendorfer, M. (CoI), Winkler, H. (CoI), Augl, S. (CoI), Plank, B. (PI), Kirchsteiger, H. (CoI), Markovic, P. (CoI), Mehmedovski, E. (CoI), Pöttinger, D. (CoI) & Maurer, J. (CoI)
01.08.2023 → 31.12.2025
Project: Research Project
-
RING - Realization of a knowledge platform for "direct current system technology and high voltage storage technology for sustainable and renewable electrical energy supply".
Diendorfer, C. (CoI), Plank, B. (PI) & Plank, B. (CoI)
Interreg Bavaria – Austria 2021 to 2027
01.04.2023 → 31.03.2026
Project: Research Project
-
Austrian DC pilot factory
Steinmaurer, G. (PI), Carreras Oliver, F. (CoI), Schnellendorfer, M. (CoI) & Kefer, P. (CoI)
01.03.2023 → 28.02.2026
Project: Research Project
-
EDDIE - European Distributed Data Infrastructure for Energy
Kurz, M. (PI), Kashyap, S. (CoI), Grünberger, S. (CoI), Penzinger, S. (CoI), Hartner, G. (CoI), Hödl, O. (CoI), Mayr, B. (CoI), Traugott, G. (CoI), Schaffer, C. (CoI), Vymazal, D. (CoI), Selinger, S. (CoI), Krösche, J. (CoI), Sonnleitner, E. (CoI), Haas, F. (CoI), Mayr, S. (CoI), Zatschkowitsch, M. (CoI), Weingartshofer, F. M. (CoI), Ellmer, B. (CoI), Dupin, A. (CoI), Reichl, M. T. (CoI) & Seifriedsberger, M. (CoI)
HORIZON Research and Innovation Actions
01.01.2023 → 31.12.2025
Project: Research Project
-
klimaaktiv Gebäude 2023+ - klimaaktiv Buildings 2023+
Leindecker, H. C. (PI), Haslehner, R. (CoI) & Rebig, M. (CoI)
01.01.2023 → 31.12.2027
Project: Research Project
-
PowerTeams - Collaborative Engineering of Smart Grid Applications
Veichtlbauer, A. (PI) & Steinmaurer, G. (CoPI)
01.04.2022 → 31.03.2025
Project: Research Project