The Influence of Inventory Deviation on Lead-Time and Utilization

Activity: Talk or presentationOral presentation

Description

It is widely known that lead-time and utilization are dependent on work in progress (WIP). This article validates the functional relationship between inventory deviation and lead-time by means of simulation. In addition, the results con¯rm a new mathematical model for the logistic operating curves in practice. A new approach is based on the idea that changing a machine from overload to underload and vice versa results in a waste of utilization and therefore in an increase in lead-times. The frequency of the changes from under- to overload and vice versa which determines this waste, is measurable by means of the statistical deviation of the inventory.
Period3 Sept 2003
Event titleOR2003 - SYMPOSIUM ON OPERATIONS RESEARCH
Event typeConference
LocationHeidelberg, GermanyShow on map