The goal of this thesis project is to conduct research in the field of insulation and specifically insulation monitoring for the high voltage power systems of electric vehicles, then develop a proof of concept prototype, that can perform on-line insulation monitoring of vehicles produced by BRP-Rotax. The monitoring device prototype shall be able to reliably detect insulation failures of 500 Ω/V on both the battery and inverter sides of the main disconnector switch of the vehicle, all while it is operating. The finished prototype implements all the features that were specifically requested by BRP-Rotax for their custom use case, and it fulfills all the requirements that were primarily formulated against it regarding its electrical capabilities. This thesis covers the research, theory, simulation, hardware and software development that went into selecting the appropriate topology, components and hardware implementation approach to ultimately solve the problem at hand. The end result is a system, that is easy to use, safe, and is ready for further experimentation and that can be tailored so it can become an integral safety and monitoring feature of electric vehicles developed by BRP-Rotax.
| Datum der Bewilligung | 2024 |
|---|
| Originalsprache | Englisch |
|---|
| Betreuer/-in | Roland Exler (Betreuer*in) |
|---|
The Development and testing of a proof of concept design for insulation measurement in high voltage battery systems of electric vehicles
Schmuck, B. (Autor). 2024
Studienabschlussarbeit: Masterarbeit