Zur Hauptnavigation wechseln Zur Suche wechseln Zum Hauptinhalt wechseln

Grid expansion and optimisation: A case study in the 110 kV and 220 kV grid

  • Tobias Vomela

    Studienabschlussarbeit: Masterarbeit

    Abstract

    In this master thesis congestions of a 220 kV and 110 kV grid structure are investigated, and analyses are carried out on how to solve them using the NOVA principle (grid optimisation before reinforcement before expansion). This principle defines, that all optimisation measures must be exhausted before reinforcement of existing lines and as a last solution construction of new infrastructure is considered. This approach is important for planning of future grids, in which an increase of feed-in from renewable energies is expected. Examined scenarios are National Trends (NT) 2030 and NT 2040 of TYNDP 2022. The analysis of the congestions and necessary measures to enable secure grid operation are in the focus of this work. The grid structure is described at first and the expected restrictions in the NT 2030 and NT 2040 are compared. Congestions are identified in the optimised load flow (OLF) after all possible optimisation measures are used. The focus in this thesis is on the congestion between the substations S1, S3 and S4 as well as S4 to S8. Secondly, the redispatch volumes at different voltage levels are compared. To analyse the significance of congestions annual energy volumes are quantified. In the following chapter expansion options are evaluated, to determine which measure is the most cost effective, to eliminate grid congestions. The analysis shows that without gird optimisation and expansion a large amount of redispatch energy is needed to balance congestions. In the NT 2040 scenario, the restrictions in the 110 kV grid rise to 286 GWh, mainly due to photovoltaic (PV) and wind energy. At 220 kV level, the restricted energy amount rises to 123 GWh affecting run-of-river- and pump storage power plants. The expansion variants V02 and V03 show a significant decrease of redispatch capacities, through grid optimisation and expansion. The variant V02 reduces redispatch volumes by using high-temperature low sag conductors (HTLS), while in the V03 a line rebuilding on 220 kV level is realised. Variant V05, which uses a Power to Gas (P2G), shows the greatest potential to reduce redispatch volumes, by reducing restriction measures. Based on the cost-benefit analysis V02 and V05 are the most economical in the NT 2040 scenario. However, based on an even longer observation period, which grid elements are designed for, also other aspects as uncertainties regarding the generation structure and the condition of pylons must be considered, which makes variants V03 and V04 attractive again.
    Datum der Bewilligung2024
    OriginalspracheEnglisch
    Betreuer/-inWilhelm Süßenbacher (Betreuer*in)

    Studiengang

    • Sustainable Energy Systems

    Zitieren

    '