The guaranteed adaptive c-charts with estimated parameter

Fatemeh Vakilian, Amirhossein Amiri, Alireza Faraz

Publikation: Beitrag in FachzeitschriftArtikelBegutachtung

3 Zitate (Scopus)

Abstract

The performance of control charts with estimated parameters in Phase II depends on the accuracy of parameter estimation in Phase I. Estimation accuracy depends on the amount of data. Simulation results show that no realistic number of Phase I samples is available to ensure that the in-control performance of control charts with estimated parameters is close to cases where the parameters are known. In this paper, the bootstrapping method is applied to adjust the control and warning limits of c-charts with adaptive sampling schemes, such as variable sample size, variable sampling intervals, and variable parameters. The adjusted charts guarantee that the in-control average adjusted time to signal is more than a certain amount with a predefined probability. In addition, the performance of the adjusted adaptive c-charts is compared with the commonly used approach to design adaptive c-charts.

OriginalspracheEnglisch
Seiten (von - bis)1575-1589
Seitenumfang15
FachzeitschriftQuality and Reliability Engineering International
Jahrgang34
Ausgabenummer8
DOIs
PublikationsstatusVeröffentlicht - Dez. 2018

Fingerprint

Untersuchen Sie die Forschungsthemen von „The guaranteed adaptive c-charts with estimated parameter“. Zusammen bilden sie einen einzigartigen Fingerprint.

Zitieren