TY - JOUR
T1 - The Arvedi Endless Strip Production line (ESP), from liquid steel to hot-rolled coil in seven minutes
AU - Arvedi, G.
AU - Mazzolari, F.
AU - Bianchi, A.
AU - Holleis, G.
AU - Siegl, J.
AU - Angerbauer, A.
PY - 2008
Y1 - 2008
N2 - The Arvedi Endless Strip Production plant to be started in Cremona, Italy, in 2008 is presented. The design and plant configuration of this facility will allow fully-continuous casting and, for the first time in the world, endless rolling of high-quality strip in a wide range of steel grades.
AB - The Arvedi Endless Strip Production plant to be started in Cremona, Italy, in 2008 is presented. The design and plant configuration of this facility will allow fully-continuous casting and, for the first time in the world, endless rolling of high-quality strip in a wide range of steel grades.
UR - http://www.scopus.com/inward/record.url?scp=84996138125&partnerID=8YFLogxK
U2 - 10.1051/metal:2008057
DO - 10.1051/metal:2008057
M3 - Article
AN - SCOPUS:84996138125
SN - 0035-1563
VL - 105
SP - 398
EP - 407
JO - Revue de Metallurgie. Cahiers D'Informations Techniques
JF - Revue de Metallurgie. Cahiers D'Informations Techniques
IS - 7-8
ER -