Abstract

Project scheduling in manufacturing environments often requires flexibility in terms of the selection and the exact length of alternative production activities. Moreover, the simultaneous scheduling of multiple lots is mandatory in many production planning applications. To meet these requirements, a new resource-constrained project scheduling problem (RCPSP) is introduced where both decisions (activity flexibility and time flexibility) are integrated. Besides the minimization of makespan, two new alternative objectives are presented: maximization of balanced length of selected activities (time balance) and maximization of balanced resource utilization (resource balance). New mixed integer and constraint programming (CP) models are proposed for the developed integrated flexible project scheduling problem. Benchmark instances on an already existing flexible RCPSP and the newly developed problem are solved to optimality. The real-world applicability of the suggested CP models is shown by additionally solving a large industry case.

OriginalspracheEnglisch
Aufsatznummer106857
FachzeitschriftComputers and Industrial Engineering
Jahrgang150
DOIs
PublikationsstatusVeröffentlicht - Dez. 2020

Fingerprint

Untersuchen Sie die Forschungsthemen von „Resource-constrained multi-project scheduling with activity and time flexibility“. Zusammen bilden sie einen einzigartigen Fingerprint.

Zitieren