T1 - Material and capacity requirements planning with dynamic lead times
AU - Jodlbauer, Herbert
AU - Reitner, Sonja
PY - 2012/1
Y1 - 2012/1
N2 - Traditional material requirements planning (MRP) does not consider the finite capacity of machines, and assumes fixed lead times. This paper develops an approach (material and capacity requirements planning; MCRP) to integrate capacity planning into MRP. To obtain a capacity feasible production plan, different measures for capacity adjustment such as alternative routeings, safety stock, lot splitting and lot summarisation, are discussed. Additionally, lead times are no longer assumed to be fixed. They are calculated dynamically with respect to machine capacity utilisation. A detailed example is presented to illustrate how the MCRP approach works successfully.
AB - Traditional material requirements planning (MRP) does not consider the finite capacity of machines, and assumes fixed lead times. This paper develops an approach (material and capacity requirements planning; MCRP) to integrate capacity planning into MRP. To obtain a capacity feasible production plan, different measures for capacity adjustment such as alternative routeings, safety stock, lot splitting and lot summarisation, are discussed. Additionally, lead times are no longer assumed to be fixed. They are calculated dynamically with respect to machine capacity utilisation. A detailed example is presented to illustrate how the MCRP approach works successfully.
KW - capacity planning
KW - dynamic lead times
KW - material requirements planning
UR - http://www.scopus.com/inward/record.url?scp=84865005887&partnerID=8YFLogxK
U2 - 10.1080/00207543.2011.603707
DO - 10.1080/00207543.2011.603707
M3 - Article
SN - 0020-7543
VL - 50
SP - 4477
EP - 4492
JO - International Journal of Production Research
JF - International Journal of Production Research
IS - 16
ER -