Abstract
We evaluate the in-control performance of the S2 control chart with estimated parameters conditional on the Phase I sample. Simulation results indicate no realistic amount of Phase I data is enough to have confidence that the in-control average run length (ARL) obtained will be near the desired value. To overcome this problem, we adjust the S2 charts control limits such that the in-control ARL is guaranteed to be above a specified value with a certain specified probability. The required adjustment does not have too much of an adverse effect on the out-of-control performance of the chart.
| Originalsprache | Englisch |
|---|---|
| Seiten (von - bis) | 4405-4413 |
| Seitenumfang | 9 |
| Fachzeitschrift | International Journal of Production Research |
| Jahrgang | 53 |
| Ausgabenummer | 14 |
| DOIs | |
| Publikationsstatus | Veröffentlicht - 18 Juli 2015 |
Fingerprint
Untersuchen Sie die Forschungsthemen von „Guaranteed Conditional Performance of the S2 Control Chart with Estimated Parameters“. Zusammen bilden sie einen einzigartigen Fingerprint.Zitieren
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver