Fast generation of production schedules on a single machine

Publikation: Beitrag in Buch/Bericht/TagungsbandKonferenzbeitragBegutachtung

Abstract

Many approaches to production scheduling are based on the step by step improvement of a given schedule. For these, finding a "good" initial schedule may critically influence performance. In the following, an extremely fast and simple method is presented for finding such a schedule in the case of a continuous-time single machine problem with the goal of minimizing setup and holding costs. In the case where there are no setups, this method always finds the optimal solution. A benchmark illustrates the possibilities of the method.

OriginalspracheEnglisch
TitelComputer Aided Systems Theory - EUROCAST 2007 - 11th International Conference on Computer Aided Systems Theory, Revised Selected Papers
Herausgeber (Verlag)Springer
Seiten861-869
Seitenumfang9
ISBN (Print)9783540758662
DOIs
PublikationsstatusVeröffentlicht - 2007
Veranstaltung11th International Conference on Computer Aided Systems Theory, EUROCAST 2007 - Las Palmas de Gran Canaria, Spanien
Dauer: 12 Feb. 200716 Feb. 2007

Publikationsreihe

NameLecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
Band4739 LNCS
ISSN (Print)0302-9743
ISSN (elektronisch)1611-3349

Konferenz

Konferenz11th International Conference on Computer Aided Systems Theory, EUROCAST 2007
Land/GebietSpanien
OrtLas Palmas de Gran Canaria
Zeitraum12.02.200716.02.2007

Fingerprint

Untersuchen Sie die Forschungsthemen von „Fast generation of production schedules on a single machine“. Zusammen bilden sie einen einzigartigen Fingerprint.

Zitieren