Traditional material requirements planning systems (MRP) schedule production orders for on-demand items without considering limited capacities of production resources. This article introduces a production planning approach which also incorporates consumption-based items and addresses capacity planning when planned orders are generated. The framework consists of three steps: drafted job list generation, capacity-driven forward scheduling and purchase order generation. Fewer predefined parameters for internally produced items than in MRP are necessary. No lot-sizing policy is applied. Lot-sizes are arranged in a forward scheduling procedure. No predefined constant lead times are used because lead times are also calculated dynamically in the planning procedure. The approach allows a (semi-) automatic finite-capacity production planning and capacity adjustment. The functionality of the approach is illustrated by a simple case study throughout the article.
| Originalsprache | Englisch |
|---|---|
| Aufsatznummer | 103126 |
| Fachzeitschrift | Computers in Industry |
| Jahrgang | 113 |
| DOIs | |
| Publikationsstatus | Veröffentlicht - Dez. 2019 |
Fingerprint
Untersuchen Sie die Forschungsthemen von „Capacity-driven production planning“. Zusammen bilden sie einen einzigartigen Fingerprint.Zitieren
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver