Zur Hauptnavigation wechseln Zur Suche wechseln Zum Hauptinhalt wechseln

An exact method for designing Shewhart and S2 control charts to guarantee in-control performance

  • Alireza Faraz

Publikation: Beitrag in FachzeitschriftArtikelBegutachtung

16 Zitate (Scopus)

Abstract

The in-control performance of Shewhart and S2 control charts with estimated in-control parameters has been evaluated by a number of authors. Results indicate that an unrealistically large amount of Phase I data is needed to have the desired in-control average run length (ARL) value in Phase II. To overcome this problem, it has been recommended that the control limits be adjusted based on a bootstrap method to guarantee that the in-control ARL is at least a specified value with a certain specified probability. In this article we present simple formulas using the assumption of normality to compute the control limits and therefore, users do not have to use the bootstrap method. The advantage of our proposed method is in its simplicity for users; additionally, the control chart constants do not depend on the Phase I sample data.

OriginalspracheEnglisch
Seiten (von - bis)2570-2584
Seitenumfang15
FachzeitschriftInternational Journal of Production Research
Jahrgang56
Ausgabenummer7
DOIs
PublikationsstatusVeröffentlicht - 3 Apr. 2018

Fingerprint

Untersuchen Sie die Forschungsthemen von „An exact method for designing Shewhart and S2 control charts to guarantee in-control performance“. Zusammen bilden sie einen einzigartigen Fingerprint.

Zitieren